Facilities

Facilities

With two premises, located in Middlesbrough and Skelton-in-Cleveland, SHAW Manufacturing’s facilities are located with excellent road and sea infrastructure networks including direct dockside and port access, as well as links to arterial routes.

Our combined facilities comprise five modern workshops with largescale assembly and storage areas. These extensive capabilities give us the competitive advantage and flexibility for SHAW to deliver a diverse range of projects for our clients – across many critical industries – both small and large. 

We continually invest in our equipment and design software to ensure that all bespoke solutions are built with the upmost precision.

River Tees Facility

Head Office:

Slipways,

Dockside Road,

Middlesbrough,

TS3 8AT

SHED DIMENSIONS/DETAILS

Fabrication Shed 1           

70 x 28m, 14m to eaves 

1 x 15T & 1 x 12.5T SWL OHTC 10m under hook

Fabrication Shed 2          

43.5 x 25m, 10m to eaves

1 x 15T & 1 x 10T SWL OHTC 6m under hook

Fabrication Shed 3          

20 x 12m, 6m to eaves

Blast Pen          

9 x 6m, 4m to eaves

Mobility         

2 x Highways Approved Works vehicles + Hire Agreement 

Main Door         

22m Wide 14m

Offices        

3000 Square feet split between 8 office rooms

3000 Square feet split between 8 office rooms

Skelton-in-Cleveland Facility

23 – 31 Wandhills Avenue,

Skelton Industrial Estate

Skelton,

Teesside

TS12 2LQ

SHED DIMENSIONS/DETAILS

Fabrication Shed 1           

40 x 18m, 7m to eaves 

2 x 10T 5m under hook

Fabrication Shed 2           

45 x 55m, 6m to eaves 

Offices           

3800 Square feet split between 12 office rooms

Technical Capabilities  

  • AutoCAD Works
  • Detailed Drawings (Vessels, Piping, Structural etc.)
  • Build-Method Drawings (3D)
  • Work Pack (Breakdown Drawings)
  • Template Development Work
  • Detail Design from P&IDs
  • Electrical and Instrumentation
  • Mechanical Works
  • NDE
  • Pressure Testing
  • Coatings
  • Subcontractor management

Equipment and Handling

9t Linde forklift

4.5 forklift

2.5 forklift

5t Side Loader

Esprit Hypertherm viper plasma cutting systems

4mx 2m to 50mm thick steel plate.

3m x 6m x up to 80mm thick steel plate.

Both with true hole technology up to 25mm thick

Lincoln Sub-arc welding column and boom 3m x 3m x 1000amps.

Vast arrangement of multi process welding equipment (Mig/Tig/stick etc.) and manipulators mostly Lincoln.

Lincoln Site welding equipment providing reliable support during scheduled works

Selection of horizontal bandsaws ranging from 20cm x 20cm up to 80cm x 80cm and roller systems

Radial Arm Drilling and site drilling machines up to 100mm  through steel.

Services throughout consist of –

110v, 240v and 415v power supply points.

Compressed Air

Amenities to hold up to 140 employees + sub-contractors and client support.

Copyright © 2022 Shaw Manufacturing. All rights reserved.